if last good read is found and if current date minus last good read date is greater than 30, meter is tagged as G-ETO. A method of claim 1 further comprising the steps of: a. A method of claim 1 further comprising the steps of: a.

meter data validating editing estimation-42

The output of this process can be customized to suit any of the popular Utility Billing Systems (UBS)'s input format and mimics a meter exchange transaction. A meter read loading process, said method comprising: a.

selecting each meter one by one and getting its current read data; b.

The method of claim 1, wherein said loading process identifies the meter reads as Good, Stale, Partial, Incomplete or Missing. The method of claim 1, wherein a set of history tables store cumulative data, demonstrative data and time of use data for each meter. The method of claim 1, wherein said protocols comprise error detection, rounding and offsetting and estimation and allocation protocols. The method of claim 1, wherein said protocols comprise the steps of: a. rounding and offsetting meter data so as to ensure that the total consumption of energy data value reported matches the sum of the time of use tiers. The method according to claim 1 further comprising the steps of: a. The method of claim 6, wherein said meter reset comprises the steps of: a. resetting the reads based on the comparison step of ‘c’; e. Comparing the current cumulative read with previous day's cumulative read; b.

obtaining a list of meters that are to be billed the same day; b. if the current cumulative read is less than the previous day's cumulative read then determining whether it is a valid rollover for the cumulative read; c.

The VEE rules that are applied can be broadly classified into five (5) categories.

They are 1) Cumulative (CUM) Read Error Detection 2) Demand (DEM) read Error Detection 3) Rounding, Truncation and Offset rules 4) Allocation and Estimation 5) Others.

copying original values to the original history tables; and g.

tagging the meter with an acronym of the rule satisfied; 2. comparing the current reads and previous day's reads for each meter; d. The method of claim 7, wherein current and previous day's reads for each meter further comprise one cumulative read and at least two time of use reads. The method of claim 7, wherein the comparing step further comprises the steps of: a.

if current read is not a good read then estimating the cumulative read based on different options; b. if old read is estimated read meter is tagged as Week Old Estimates. A method of claim 1 further comprising the steps of: a.

if old read is good meter is tagged as Week Old Read. if current read is not a good read then finding the last good read; b.

if current read is partial read and if it is not possible to estimate the cumulative read based on different options then meter is tagged as Partial Did Not Estimate. A method of claim 1 further comprising the step of: a.